Marble Floor Tiles in Porch – Update
This week, we did a lot of minor updates in floor tiles, false ceilings, cement plastering etc, and also installed marble floor tiles in Porch area.
Marble Floor Tiles in Porch – Update Read Post »
This week, we did a lot of minor updates in floor tiles, false ceilings, cement plastering etc, and also installed marble floor tiles in Porch area.
Marble Floor Tiles in Porch – Update Read Post »
Now that the spring is here, we are not only enjoying the moderate temperatures, but we also finished our floor tile and false ceiling installation works.
Finishing Floor Tiles and False Ceiling Read Post »
We need to design our False Ceiling first, before we can even think of starting to install it. Let’s discuss it one by one.
Designing and Installation of False Ceiling Read Post »
False Ceiling not only hides ugly ceiling, but it can also be transformed in hundreds of ways. It not only looks great, it also has practical applications.
False Ceiling – All You need to know! Read Post »
In 6 days, the tiles on bathroom walls were near completion. We decided not to waste any time and start installing the room floor tiles and skirting.
Installation of Room Floor Tiles, and Skirting Read Post »
Making sure that the ground is leveled properly and then installing the tiles one by one, the task is not as easy as it seems.
Finishing Floor tile work on roof, and other updates Read Post »
Different types of tiles are made to serve different purposes. It is not wise to install one particular type of tile in all the rooms.
Selection of Floor Tiles for our House Read Post »
In Pakistan; Marble flooring has been the only choice for quite some time, but now tiles are gradually gaining attention of more and more house builders.
Flooring and Wall – A complete guide on types of Tiles in Pakistan Read Post »
Our estimate is that it will take about a week to finish plastering the outer walls. After that we’ll finalize the plumbing.
Finishing Cement Plastering and Plumbing – Construction Update 11 Read Post »
The construction of water tank is complete, we’ll let it dry and test it in a few days for any leaks or cracks. In the meantime, we can start working on our next task, i.e. cement plastering.
Cement Plastering – Construction Update 10 Read Post »